Tel : (+65) 6261 6162
Email : admin@astartesting.com.sg
Download Brochure
News & Events

Astar Testing and inspection ( S ) Pte Ltd, have been Award with local partner “ Kangean Energy Indonesia (KEI) for the development of the Teranga Field (5 wells) Phase I project” from PT Timas Suplindo

The gas pipeline project aims to meet the maximum export gas rate of 330 MMscfd, the TSB fields is located in a seismically active area in the bali approximately 120 km from Pagerung island, off the north coast of East Java.

The pipe section is 24 kilometres, 26” (API 5L X65) Production PL, with 4mm AE

<< back
Our Credentials